Desktop app for large markdown knowledge bases, using plain files, Git versioning, YAML frontmatter, offline use, open source, and Claude Code AI integration.
Italy
EU



Desktop app for large markdown knowledge bases, using plain files, Git versioning, YAML frontmatter, offline use, open source, and Claude Code AI integration.



A coding-agent skill that turns one-line ideas into interactive isometric machines with SVG parts, live readouts, controls, shaders, or 3D movement.




Vector UI design canvas for IDEs, offering infinite canvas, layers, reusable components, synced design tokens, code integration, and AI assistant support.




Emdash is a provider-agnostic desktop app that lets you run multiple coding agents in parallel, each isolated in its own git worktree, either locally or over SSH on a remote machine. We call it an Agentic Development Environment (ADE).


Self-hosted coding agent platform with voice support, Git worktree integration, and multi-provider compatibility. Access from phone, desktop, or terminal.




Paradev (formerly Superset) is an agentic IDE to orchestrate parallel 100+ coding agents in isolated git worktrees with built-in diff viewer, terminal, rapid workspace switching, and cross-platform support.


Inspects websites, apps, games and files with evidence-based tools, then guides a coding agent to build, compare and refine a new project.




A minimalist, terminal-native coding agent. A single native C binary that uses a few MBs of RAM. Local models are first-class via llama.cpp and Ollama; also OpenAI, Anthropic, OpenRouter, and Codex.

An open-source API for building and running AI agents with durable state, any model or machine, custom tools, and managed or self-hosted deployment.


Spillway is an open-source, self-hosted AI gateway for teams that use cloud and local language models. It runs as a single Docker container with an admin UI and SQLite storage.



Run parallel Claudes safely in containers. Jump between their environments to instantly test changes. Get suggestions that catch critical issues as you go.




JetBrains Air is the Agentic Development Environment where Codex, Claude Agent, Gemini CLI, and Junie execute independent task loops without interfering with each other.




A sandboxed AI agent orchestration platform built with Rust and GPUI. Run multiple AI coding agents (Claude Code, Codex, etc.) in isolated sandbox environments with full terminal access.

T3 Code is a minimal web GUI for coding agents. Currently Codex-first, with Claude Code support coming soon.
Spawn and control multiple Claude Codes in parallel. Happy Coder runs on your hardware, works from your phone and desktop, and costs nothing. Open source.



A live companion for Claude Code that lives in your MacBook notch. Reacts to what Claude is doing, intercepts permission prompts, and shows all your running sessions at a glance.




Free SEO autopilot that researches keywords, writes fact-checked articles and publishes them to your site as GitHub pull requests. 2 articles per month free; paid plans from $19.




Native macOS app shows live CPU, GPU, memory, and network stats, manages ports, tracks coding agent sessions, supports local and remote monitoring, and secures on-device data.




Lets coding agents build videos as HTML pages and provides a local timeline editor for adjusting layers, clips, subtitles, colors and text.




A Windows desktop app for running multiple AI coding agents side-by-side — Claude Code, Codex, GitHub Copilot, or any CLI tool — in a tabbed and grid-layout terminal host.

A Claude Code plugin that automatically captures everything Claude does during your coding sessions, compresses it with AI (using Claude's agent-sdk), and injects relevant context back into future sessions.





