Self-configurable discrete-event simulation software for open-pit and underground mines featuring 2D and 3D visualization, fleet and equipment modeling, scenario comparison, operational analytics, risk evaluation, and compatibility with engineering formats.

MineTwin’s 2D open-pit simulation view maps the mine, roads, crusher, stockpile and waste storage while displaying plan fulfilment, equipment availability, production and development results, haulage-distance distributions, and daily operating statistics.

Cost / License

  • Free Personal
  • Proprietary

Since

  • Since 2026

Platforms

  • Windows
  • Mac
  • Linux
2likes
0articles
Save

Features

Highlights All activities

MineTwin News & Activities

Recent activities

  • Selaelo-K liked MineTwin
  • Selaelo-K reviewed MineTwin  

    The platform is quite intuitive in the UI design, easy to use and beginner friendly. I like the integration of spreadsheets in model parameterisation. This allows my none developer clients to configure the desired schedule scenarios. I'm yet to find anything to complain about

  • devonAtTheAnyLogicModeler reviewed MineTwin  

    I like MineTwin because it’s an exceptionally fast and versatile tool for simulating both open-pit and underground mining operations. It makes comparing complex scenarios, identifying bottlenecks, and testing mine plan feasibility effortless.

  • Guest A comment was removed from MineTwin
  • Guest A comment was removed from MineTwin
  • Guest A comment was removed from MineTwin
  • Mefhsm reviewed MineTwin  

    It was a wonderful experience, as it´s the most comprehensive solution tailored for open-pit and underground mining applications. A user-friendly solution and far better than general-purpose simulation software. Its full capabilities and wonderful features of simulation, optimization, and prediction are fully applied to mining operations.

  • jacobenvosloo reviewed MineTwin  

    MineTwin is well suited to studies where several parts of the mining operation interact and a simple spreadsheet calculation is not enough. We use it to compare fleet sizes, test changes to schedules and mine plans, investigate bottlenecks, assess equipment utilisation and understand how delays or equipment failures could affect production. It is also useful when comparing several scenarios and then rerunning the same studies after receiving updated Deswik or Vulcan mine plan files.

  • jacobenvosloo A comment was removed from MineTwin
  • jacobenvosloo updated MineTwin

Comments and Reviews

   
devonAtTheAnyLogicModeler
0

I like MineTwin because it’s an exceptionally fast and versatile tool for simulating both open-pit and underground mining operations. It makes comparing complex scenarios, identifying bottlenecks, and testing mine plan feasibility effortless.

Review from a new or low-activity account — shown here, but not counted in the app rating.
Selaelo-K
0

The platform is quite intuitive in the UI design, easy to use and beginner friendly. I like the integration of spreadsheets in model parameterisation. This allows my none developer clients to configure the desired schedule scenarios. I'm yet to find anything to complain about

Review from a new or low-activity account — shown here, but not counted in the app rating.
Mefhsm
0

It was a wonderful experience, as it´s the most comprehensive solution tailored for open-pit and underground mining applications. A user-friendly solution and far better than general-purpose simulation software. Its full capabilities and wonderful features of simulation, optimization, and prediction are fully applied to mining operations.

Review from a new or low-activity account — shown here, but not counted in the app rating.
jacobenvosloo
0

MineTwin is well suited to studies where several parts of the mining operation interact and a simple spreadsheet calculation is not enough. We use it to compare fleet sizes, test changes to schedules and mine plans, investigate bottlenecks, assess equipment utilisation and understand how delays or equipment failures could affect production. It is also useful when comparing several scenarios and then rerunning the same studies after receiving updated Deswik or Vulcan mine plan files.

What is MineTwin?

MineTwin is simulation, planning and decision-support software developed specifically for open-pit and underground mining operations. It enables mining companies, engineers and consultants to create realistic digital twins of mines, simulate operational processes and evaluate proposed changes before committing equipment, capital or production resources.

The software combines discrete-event simulation, automated scheduling and optimization to model mine layouts, production targets, equipment fleets, haulage networks, material flows, maintenance schedules and operational constraints. MineTwin can represent drilling, charging, blasting, bolting, loading, hauling, crushing, hoisting, stockpiling, conveyors, rail transport and supporting activities.

Users can test alternative fleet configurations, equipment allocations, production schedules, layouts, infrastructure investments and new technologies without disrupting the real operation. Multiple scenarios can be compared using consistent operational, production and financial indicators.

MineTwin accounts for equipment availability, queues, congestion, changing haul distances, road conditions, maintenance interruptions, variable cycle times and coordination delays. This helps teams identify bottlenecks, determine whether production plans are achievable and understand how decisions in one part of the mine affect the wider operation.

Fleet-sizing and equipment-allocation tools help users evaluate availability, utilization, idle time, delays, operating costs and plan fulfilment. Interactive 2D and 3D views display mine layouts, routes, equipment movement and operational progress. Dashboards, Gantt-style timelines, tables, charts and detailed logs make results transparent and easier to communicate. Results can also be exported to Microsoft Excel.

MineTwin supports spreadsheet-based scenario preparation and common engineering formats, including XLSX, TXT and DXF. Depending on the edition and data type, additional formats such as STR, OBJ and DTM may be used.

Published MineTwin case studies report results including $262 million in fleet-optimization savings across six underground mines, a 7% improvement in projected mine NPV through autonomous-haulage analysis, a 10% improvement in annual planning accuracy and a 90% reduction in production-plan shortfall risk in a coal-mine study.

MineTwin is available for Windows and macOS and operates primarily as a desktop application. Optional server-based simulation is available for larger studies. It is intended for mining companies, mine planners, engineers, operations managers, technical-services teams, simulation specialists and mining consultancies.

MineTwin Videos

Show 3 more videos

MineTwin information

  • Developed by

    AE flagAmalgama Software Design
  • Licensing

    Proprietary and Free Personal product.
  • Pricing

    One time purchase ranging between $70000 and $170000, and / or subscription ranging between $7000 and $10000 per month.
  • Alternatives

    7 alternatives listed
  • Badge

    Get an embeddable badge for MineTwin
  • Supported Languages

    • English

AlternativeTo Category

Photos & Graphics

Popular alternatives

View all

Our users have written 4 comments and reviews about MineTwin, and it has gotten 2 likes.

MineTwin was added to AlternativeTo by jacobenvosloo on and this page was last updated .